Boathouse Alterations July

 

Visit main RNLI site

 

Boathouse Alterations

Photos taken by Rhodri Jenkins

RNLI Project Supervisor

Click on photo to enlarge

 

 

Week Ending 26/7/08

Boatwell slab removal continues
New walkway to crew room installed
View of first concrete toe unit at low tide as installed
Crew room ceiling replaced

 


Week ending 19/7/08
Cutting down existing columns
First Precast concrete toe unit lowered into place
First Precast concrete toe unit lowered into place
Dive works continue in positioning concrete unit

 


Week ending 11/7/08

Barge moved to new location at end of the slipway
Fuel Tank removed
Cutting out floor beams with rope saw
Floor beams partially removed

 


Week ending 5/7/08

 

Installing penultimate slipway section



Aerial view of works
Aerial view of works
View up the new slipway