Boathouse Alterations

Photos taken by Rhodri Jenkins

RNLI Project Supervisor

Click on photo to enlarge

 

 

Week ending 26/4/08

Safety Boat poised ready to leap into action
Scaffolding to the underside of the slipway transoms
Falsework lowered down to the loading platform by crane
Breaking out the concrete toe of the slipway

Week ending 19/4/08

Crew room floor reinstatements
Divers undertaking survey works at the end of the
slipway
Excavator gaining access onto the slipway


Week ending 12/4/08

Falsework to underneath Boathouse
Start cutting away old slipway
Crew room beams raised to new levels
Breaking up the bilge beams in the boathouse.

Week ending 5/04/05

Falsework to underside boathouse
Scaffolding crash deck to crew room
Slipway steelwork ready for fabrication

Week ending 29/3/08

winch removed for replacement
falsework to underside of boathouse
crew room strip out

Week ending 22/3/08

Access steps to beach area
Temporary Loading platform to beach
Crew Room strip out
got to start somewhere!!!!
Temporary station